ASE Integrating and Managing HP BladeSystem in the Enterprise - TECHNICAL LAB DAYS
Course Code: 00071290 LAB DAYS
Length: 2 Days
Delivery Method: Instructor-Led
Price:
$1,800.00 US & Canada Partners*
*Plus applicable taxes
Registration
Partners:To register for this course, call 1.800.732.5741, Option 4 (U.S.) or 1.800.392.7024, Option 4 (Canada).
HP Employees: To register by phone, call 1.800.732.5741, Option 4 (U.S.) or 1.800.392.7024, Option 4 (Canada).
Course overview
This two day lab is designed to allow the student to execute the labs from the ASE Integrating and Managing HP BladeSystem in the Enterprise as self paced. Students are required to review the written course materials prior to attending the 2 day lab session. Instructors will be available to assist with the hands on labs and answer questions. This course is intended for experienced technical students. Lecture content will not be presented in this 2 day course.
Install a Brocade 4Gb SAN Switch for the HP BladeSystem
Verify the Brocade 4Gb SAN Switch
Explain the process of booting from a SAN
Use the available Scripting and CLI Interfaces
Write scripts for Onboard Administrator
Write scripts for HP Insight Control Management
Write scripts for HP Integrated Lights Out (iLO) 2
Deploy OS, virtualization layer, and virtual machines
Detect disk bottlenecks
Configure network interface controller (NIC) teams
Generate reports with PMP
Pre-Requisites
Complete review of the 00071290 technical course lecture modules.
Upon paid registration fee, the course lecture modules will be available for download
Recommended prerequisite training found in the Learning Center:
1822 - Storage Technologies (WBT)
489 - HP Storage Software and Solutions Full-Line Technical Training (WBT)
488 - HP StorageWorks Full-Line Technical Training (WBT)